The foundation was poured in the fall of 2022 and building was installed March 2023. Inside wall framing, electric wiring/plumbing started, and Power/gas lines installed to building this summer. Our next steps are to raise an estimated $46,000 needed funds for the utility lines to be installed, inside finish work, outdoor kennels runs installed and security fencing surrounding outdoor kennel area.

Our hopes are enough funds are raised to have kennel building completed and operational to start caring for animals by summers end of 2024.